Technical Assistance

Technical Assistance

The WBIF through the Implementation Project Facilities (IPFs) provides the technical assistance to the main investment projects in the form of feasibility and ESIA studies, detailed design, etc.

Filtered by:

Showing 151 to 175 of 560 grants

Beneficiary Investment Sector Status Completion (est)
Montenegro Montenegro, Ad-hoc Support to TA Round 34 for Preparation of Phase 2 GAF for WB34-MNE-ENV-01 Environment Active 29 May 2026
Montenegro Montenegro, Capacity Building on Preparation of Grant Application Forms (GAFs) under WBIF: WB33-MNE-ENE-01 – Construction and Connection to Transmission Grid of Buljarica, Bečići and Bijela Substations: Feasibility Study, Conceptual Design, ESIA Energy Completed 25 Jan 2026
Kosovo* Assessment of the alternatives to deliver utility-scale dispatchable renewable power to Kosovo Energy Completed 28 Mar 2024
Bosnia and Herzegovina Bosnia and Herzegovina, Capacity Building on Preparation of Grant Application Forms (GAFs) under WBIF: WB33-BIH-ENE-02 – Internal Transmission Electricity Grid Reinforcement for RES Integration in BiH: Pre-feasibility Study, SESA, Spatial Planning Documentation Extract, Implementation Roadmap Energy Completed 25 Jan 2026
Albania Electrification of Durres – Tirana PTT – Tirana CCS Railway Line and Link to Tirana Airport Transport Active 12 Jul 2024
Serbia Palace of Justice Social Completed 30 Nov 2019
Serbia Central Balkan Corridor: Feasibility Study for 400 kV Bajina Basta – Kraljevo Overhead Transmission Line Energy Completed 26 Apr 2018
Albania Higher and Professional Education Finance in Southeast Europe - pilot project Social Completed 31 Dec 2015
Bosnia and Herzegovina Study for Establishment of the Protection Zones of a “Klokot” Source (Bihać) Intersected by Interstate Boundaries Environment Completed 30 Dec 2020
Albania Sector Study on Biomass-based Heating in the Western Balkans Energy Completed 30 Jun 2018
North Macedonia Motorway A4 Skopje - Blace: Stenkovec Interchange - Blace Section Transport Completed 16 Jul 2023
North Macedonia 400kV Interconnection Bitola (North Macedonia) - Elbasan (Albania) Line and Substation Energy Completed 28 Feb 2019
Kosovo* Railway Route 10 Rehabilitation: Fushe Kosove – Hani i Elezit Section Transport Completed 31 Dec 2019
Croatia Zadar Uni: new campus & Learning Resource Centre Social Completed 31 Dec 2021
Croatia Health institutions reconstruction and construction of departments and centres Social Cancelled 31 Dec 2017
Croatia JANAF oil pipeline upgrading Energy Cancelled n/a
Bosnia and Herzegovina WATSAN Programme in the Federation of Bosnia and Herzegovina: Programme Management Support Environment Completed 24 Nov 2017
Bosnia and Herzegovina Pale District Heating Project Energy Cancelled n/a
Bosnia and Herzegovina Vinac Hydropower Plant Energy Cancelled n/a
Bosnia and Herzegovina HHP Babino selo Energy Completed 31 Jul 2019
Serbia Orient/East-Med (CX) Corridor: Feasibility Study for Reconstruction and Modernisation of Stalać – Djunis Section on Belgrade – Niš Railway Line Transport Completed 31 Oct 2018
Serbia Extended TA for Improvement of Prison Facilities Social Completed 01 Mar 2015
Serbia EE Programme in public buildings – Serbia EEP Energy Active 31 Jan 2027
Bosnia and Herzegovina Support to water resources management in Drina River Basin Environment Completed 30 Nov 2015
Montenegro Reconstruction of main water supply pipeline in Andrijevica Environment Completed 30 Oct 2017

*This designation is without prejudice to positions on status, and is in line with UNSCR 1244/1999 and the ICJ Opinion on the Kosovo declaration of independence.