Orient/East Med Corridor: Serbia - Bulgaria CXc Rail Interconnection, Sicevo - Stanicenje - Dimitrovgrad Section

Orient/East Med Corridor: Serbia - Bulgaria CXc Rail Interconnection, Sicevo - Stanicenje - Dimitrovgrad Section

Project Description

The action includes the construction works on the rail tracks and the preparatory works for electrification and equipping with signalling and telecommunication devices of the section Sicevo – Stanicenje – Dimitrovgrad. (The action is component 1 of the project).

The works will be performed, in two stages:

  • Stage A2 (proposed for the WBIF financing with support of EIB loan) from Sicevo to Stanicenje (from km 16+668 to km 64+152), over the length of around 48 km.
  • Stage A3 (proposed for WBIF financing with support of EIB loan) from Stanicenje to Dimitrovgrad (from km 64+152 to km 96+700), over the length of around 32 km.

The works include the reconstruction of the rail track infrastructure, together with preparatory works for electrification and modernization of the railway line (foundations for the OCL masts, channel ducts for signalling and telecommunication lines, securing of level crossings) and temporary equipping of locations with signalling and telecommunication devices until the installation of permanent electronic signalling devices.

Partner Financial Organisations

Western Balkans Partners