Leverage through Grant Financing

This analysis shows the leverage of grants to IFI loans and the leverage provided by IFI loans to the total cost of the project. It is provided only within projects that combine grants and loans.

  • All Projects (total: 61)
  • Total amount in €: 5.126.161.900

Leverage through Grant Financing
Project Grant Loan External financing / cost ratio Leverage
Name Total Cost € Financing institution Amount € Financing institution Amount € Loan / grant multiplier Cost / external financing multiplier
Corridor X Serbia (E 75) Motorway 969.300.000
EIB 4.500.000
EIB 384.000.000
EIB 195.000.000
60.2% 128.7 1.7
Belgrade City Sava Bridge 404.900.000
EIB 240.000
EIB 160.000.000
39.6% 666.7 2.5
Construction of new carriage way and rehabilitation of the section Demir Kapija - Udovo - Smokvica (Corridor X) 300.000.000
EC 27.000.000
EIB 130.000.000
EBRD 107.000.000
88.0% 8.8 1.1
Belgrade Highway and Bypass Project 285.600.000
EAR 6.100.000
EBRD 80.000.000
EIB 80.000.000
58.2% 26.2 1.7
Rehabilitation and construction of the water supply and sewerage collection infrastructure in BiH 169.900.000
EC 16.500.000
EIB 60.000.000
EBRD 7.000.000
KfW 10.000.000
55.0% 4.7 1.8
TA for Railways rehabilitation II 168.700.000
EBRD 1.000.000
EIB 84.000.000
EBRD 60.000.000
86.0% 144.0 1.2
Fier and Vlore bypass roads 167.000.000
EC 8.000.000
WBIF 8.000.000
ITX 8.000.000
EBRD 53.000.000
EIB 53.000.000
77.8% 4.4 1.3
Municipal and Regional Infrastructure 150.000.000
EC 375.000
EIB 75.000.000
50.2% 200.0 2.0
Secondary and Local Roads Programme 137.000.000
EBRD 4.000.000
EIB 50.000.000
EBRD 50.000.000
75.9% 25.0 1.3
Regional and Local Roads Programme 132.900.000
WBX 3.000.000
WBX 70.000.000
EBRD 50.000.000
92.6% 40.0 1.1